Start Free Book Demo
Built for UK construction teams

Construction waste tracking
software

Log every skip load by type and disposal route as it leaves site. VerdCore calculates your recycling rate and landfill diversion automatically, and exports a Site Waste Management Plan — with the transfer note evidence behind every figure.

Recycling & diversion rate
SWMP-ready export
Scope 3 emissions built in
Free to start
Built around how UK waste is actually evidenced
Duty of Care SWMP BREEAM Resources DEFRA 2026 GHG Protocol

Everything a UK contractor needs
to track site waste

From the skip leaving site to the report a client, assessor or auditor asks for.

Waste logging by type & route
Log every load — concrete, timber, plasterboard, metals, mixed — by type and disposal route as it leaves site, not reconstructed from invoices later.
Recycling & landfill diversion rate
Both figures tracked separately, since diversion also counts reuse and energy-recovery incineration that recycling rate alone misses.
Site Waste Management Plan export
Forecast versus actual, recycling and diversion rates, and the evidence behind them — exported on demand, kept live through the project instead of written once at tender.
Automatic Scope 3 emissions
Every load is converted to kg CO₂e on DEFRA factors and feeds directly into your Scope 1/2/3 breakdown, Carbon Reduction Plan and PAS 2080 report.
Waste transfer note evidence
Every load carries its transfer note or consignment note — the actual legal evidence of Duty of Care — searchable in one Evidence Library, not scattered across email.
Alongside carbon
Waste sits alongside your carbon, water and biodiversity tracking — one set of project data, not a separate waste spreadsheet reconciled at the end of the job.

Replace the waste spreadsheet

Everything you're already trying to reconstruct from skip tickets and email, unified into one auditable system.

Spreadsheets
VerdCore
Transfer notes scattered in email
Evidence attached to every load
Recycling rate only
Recycling & landfill diversion tracked
SWMP written once, never updated
Live record, exported on demand
Waste separate from carbon
Feeds Scope 3 automatically

Three steps to evidenced
waste reporting

1
Log each load
Type, weight, disposal route and transfer note — entered as skips leave site, on site or offline.
2
Track the rates
Recycling rate and landfill diversion update in real time, alongside the Scope 3 emissions each load carries.
3
Export & evidence
A SWMP-ready report and the transfer note evidence behind it, ready whenever a client or auditor asks.

Built around how waste is
actually checked on site

SWMPs stopped being a statutory requirement in 2013, but the underlying obligations and expectations didn't.

Duty of Care
The Environmental Protection Act 1990 obligation to evidence who handled your waste, from production to final disposal.
Site Waste Management Plans
No longer a statutory requirement, but still asked for contractually by main contractors, clients and planning conditions.
BREEAM Resources
Credits awarded for a SWMP that forecasts, monitors and reports on waste through the project.
GHG Protocol Scope 3
Waste generated in operations, converted to CO₂e on DEFRA factors, feeding your wider carbon reporting.

The framework behind the software

A plain-English guide to Site Waste Management Plans, and how waste connects to your wider reporting.

Frequently asked questions

What is construction waste tracking software?
It logs skip loads by type and disposal route as they leave site, and turns that into a recycling rate, a landfill diversion rate, and the waste-related Scope 3 carbon figures — instead of reconstructing a year of waste transfer notes from memory before an audit or a Site Waste Management Plan is due.
Does VerdCore calculate my recycling rate automatically?
Yes. Every load you log is categorised by type and disposal route, and VerdCore calculates both your recycling rate and your landfill diversion rate automatically — the two are different, and tracking only recycling rate understates performance from incineration with energy recovery or direct reuse.
Can VerdCore generate a Site Waste Management Plan (SWMP)?
Yes. VerdCore exports a SWMP-ready report from your logged waste data — forecast versus actual, recycling and diversion rates, and the waste transfer note evidence behind each entry — on demand rather than as a document written once at tender and never updated.
What's the difference between recycling rate and landfill diversion rate?
Recycling rate only counts material that is genuinely recycled. Landfill diversion rate also counts waste that is reused directly or incinerated with energy recovery — both legitimately avoid landfill even though neither is "recycling" in the strict sense. VerdCore tracks both, so reports are specific about which figure is being quoted.
Does waste tracking feed into my carbon reporting?
Yes. Waste is one of the largest Scope 3 categories on a construction project once materials are accounted for. Every logged load is converted to CO₂e on DEFRA factors and feeds the same Scope 1/2/3 breakdown used in your Carbon Reduction Plan and PAS 2080 reports, rather than sitting in a separate spreadsheet.
Is there a free plan?
Yes. VerdCore is free to start, with a 14-day Pro trial and no card required. Paid plans start from £19/month for firms that need more projects, reports and team seats.

Track waste without the spreadsheet

Free for two sites, no card. A sample project loads automatically so you can explore the Waste Tracker right away. No card required.

Start for free →