title: "PPN 06/21 Explained: Carbon Reduction Plans for UK Public Tenders"
description: "PPN 06/21 explained: which contracts it covers, what a Carbon
  Reduction Plan must include, and mistakes that fail a bid."
metaTitle: "PPN 06/21 Explained: Carbon Reduction Plans"
category: Compliance
date: 2026-07-20
dateModified: 2026-08-24
readingTime: 6 min read
lead: If you bid for major UK government contracts, PPN 06/21 is the reason
  you're being asked for a Carbon Reduction Plan. Here's what it actually
  requires, in plain English, and how to produce a plan that passes.
cardDescription: Which contracts it covers, what a compliant Carbon Reduction
  Plan must include, the Scope 3 categories you must report, and the mistakes
  that fail a bid.
ctaHeading: Generate your Carbon Reduction Plan automatically
ctaBody: VerdCore tracks Scope 1, 2 & 3 as you work and produces a PPN
  06/21-ready Carbon Reduction Plan from real data — DEFRA factors built in.
footerNote: This guide is general information, not legal or compliance advice.
  Always check the current PPN 06/21 guidance on GOV.UK.
ogTitle: "PPN 06/21 Explained: Carbon Reduction Plans for UK Tenders"
ogDescription: Which contracts PPN 06/21 covers, what a compliant Carbon
  Reduction Plan must include, and the mistakes that fail a bid.
faq:
  - q: What is PPN 06/21?
    a: Procurement Policy Note 06/21 is the UK Government requirement that suppliers bidding for qualifying central government contracts above £5 million a year must publish a Carbon Reduction Plan committing to Net Zero by 2050, as a pass/fail selection requirement.
  - q: Which contracts does PPN 06/21 apply to?
    a: Procurements by central government departments, their executive agencies and non-departmental public bodies for contracts with an anticipated annual value above £5 million, excluding VAT.
  - q: What Scope 3 categories must a PPN 06/21 Carbon Reduction Plan include?
    a: Business travel, employee commuting, upstream transportation and distribution, waste generated in operations, and downstream transportation and distribution, alongside full Scope 1 and Scope 2 reporting.
  - q: How often must a Carbon Reduction Plan be updated?
    a: At least annually. A plan published once and never refreshed is treated as out of date and non-compliant, which can cause a bid to fail regardless of the quality of the rest of the response.
---
## What is PPN 06/21?

[**Procurement Policy Note 06/21**](https://www.gov.uk/government/publications/procurement-policy-note-0621-taking-account-of-carbon-reduction-plans-in-the-procurement-of-major-government-contracts) — "Taking account of carbon reduction plans in the procurement of major government contracts" — took effect on **30 September 2021**. It makes a supplier's commitment to Net Zero a formal condition of bidding for large public contracts.

In practice, it means that before you can win qualifying work, you must publish a **Carbon Reduction Plan (CRP)** that measures your emissions and commits your organisation to Net Zero by 2050. No compliant plan, no bid. It is a pass/fail selection requirement, not a scored "nice-to-have".

It sits alongside other carbon frameworks a contractor meets — [PAS 2080](/resources/pas-2080-for-contractors.html) for how carbon is managed through delivery, and [SECR](/resources/secr-explained.html) for the statutory disclosure in your annual accounts — but PPN 06/21 is the one that gates whether you can bid at all.

## Which contracts and suppliers does it apply to?

PPN 06/21 applies to procurements carried out by **central government departments, their executive agencies, and non-departmental public bodies for** contracts with an anticipated annual value **above £5 million** (excluding VAT).

Two things catch construction firms out:

* **It's about your organisation, not the project.** The CRP reports your company's total emissions, not just the emissions of the contract you're bidding for.
* **It cascades down supply chains.** Even if you never bid for the central government directly, a main contractor that does will increasingly ask you for the same emissions data, so the requirement reaches far beyond the £5m threshold.

## What must a carbon reduction plan include?

A compliant CRP has to do five things:

1. **Confirm a commitment to Net Zero** — a clear statement that your organisation is committed to achieving Net Zero carbon emissions in the UK by 2050.
2. **Report your baseline and current emissions** — your Scope 1 and Scope 2 emissions in full, plus a defined subset of Scope 3 (see below).
3. **Set out your reduction measures** — the environmental management measures and carbon-reduction projects you have in place or plan to introduce.
4. **Be published on your UK website** and kept up-to-date, reviewed and republished at least annually.
5. **Be signed off at board or director level** — the plan must be formally approved by a director (or equivalent).

## The Scope 3 categories you must measure

PPN 06/21 does not require full Scope 3 reporting, but it does mandate a specific subset. As a minimum, your CRP must include these Scope 3 categories:

* Business travel
* Employee commuting
* Upstream transportation and distribution
* Waste generated in operations
* Downstream transportation and distribution

All figures should be calculated using the UK government's **DEFRA greenhouse gas conversion factors** for the reporting year and reported in tonnes of CO₂e.

> **Scope quick refresher.** Scope 1 = emissions you burn directly (site diesel, plant, company vehicles). Scope 2 = purchased energy (grid electricity). Scope 3 = everything else in your value chain (materials, subcontractor transport, waste) — see our full guide to [Scope 1, 2 and 3 emissions in construction](/resources/scope-1-2-3-emissions-construction.html). PPN 06/21 requires Scope 1, Scope 2, and the five Scope 3 categories above.

## Common mistakes that fail a bid

* **An out-of-date plan.** A CRP published two years ago and never refreshed is non-compliant; it must be reviewed and republished at least annually.
* **Missing the Scope 3 subset.** Reporting only Scope 1 and 2 is the most common failure. The five Scope 3 categories are mandatory, not optional.
* **No director sign-off.** The plan has to be formally approved at board level and said so.
* **Not actually published.** The CRP must be publicly available on your own website. A PDF emailed only to the buyer doesn't meet the requirement.
* **Emissions that don't add up.** Figures that aren't traceable to a recognised methodology (DEFRA factors) invite challenge.

| Fails the bid | Passes the bid |
| --- | --- |
| Published once, never refreshed | Reviewed and republished at least annually |
| Scope 1 and 2 only | Scope 1, 2, and the five mandatory Scope 3 categories |
| No director sign-off | Formally approved at board or director level |
| Emailed to the buyer only | Publicly available on your own UK website |
| Figures with no stated methodology | Calculated on current DEFRA conversion factors |

## How to produce a compliant Carbon Reduction Plan

The workflow is the same every year:

1. **Measure.** Capture fuel, energy, materials, transport, and waste, and convert them to CO₂e using the current DEFRA factors.
2. **Report.** Split the total into Scope 1, Scope 2, and the required Scope 3 categories, against a fixed baseline year.
3. **Commit.** State your Net Zero-by-2050 commitment and the specific measures you're taking to reduce emissions.
4. **Approve and publish.** Get the director's sign-off and publish the plan on your website.
5. **Repeat annually.** Update the numbers and republish each year so it never lapses.

<div class="diagram">
<div class="diagram-title">The annual Carbon Reduction Plan workflow</div>
<div class="steps-diagram">
<div class="step-item"><div class="step-num">1</div><div class="step-body"><div class="step-title">Measure</div><div class="step-desc">Fuel, energy, materials, transport and waste, converted to CO₂e on current DEFRA factors.</div></div></div>
<div class="step-item"><div class="step-num">2</div><div class="step-body"><div class="step-title">Report</div><div class="step-desc">Split into Scope 1, Scope 2 and the required Scope 3 categories, against a fixed baseline year.</div></div></div>
<div class="step-item"><div class="step-num">3</div><div class="step-body"><div class="step-title">Commit</div><div class="step-desc">State the Net Zero-by-2050 commitment and the specific reduction measures you're taking.</div></div></div>
<div class="step-item"><div class="step-num">4</div><div class="step-body"><div class="step-title">Approve &amp; publish</div><div class="step-desc">Director sign-off, then published on your own UK website — not emailed to the buyer.</div></div></div>
<div class="step-item"><div class="step-num">5</div><div class="step-body"><div class="step-title">Repeat annually</div><div class="step-desc">Update the numbers and republish every year so the plan never lapses.</div></div></div>
</div>
</div>

The hard part isn't the template; it's keeping accurate emissions data throughout the year so the numbers are ready when a tender lands — the same evidence that helps you answer the wider carbon questions in [winning construction tenders on carbon](/resources/winning-construction-tenders-on-carbon.html).

Keeping those numbers current all year is what [construction carbon reporting software](/construction-carbon-reporting-software.html) is built for, so producing a Carbon Reduction Plan is an export rather than a scramble.