title: "Biodiversity Net Gain (BNG) Explained: What Developers Must Do"
description: "Mandatory Biodiversity Net Gain in England: the 10% rule, the
  statutory metric, and what developers must evidence for planning
  permission."
metaTitle: "Biodiversity Net Gain (BNG) Explained"
category: Compliance
date: 2026-07-19
dateModified: 2026-08-24
readingTime: 7 min read
lead: Since 2024, most new developments in England must deliver a measurable
  gain for nature — not just avoid harm. Here's what Biodiversity Net Gain
  actually requires, and how to evidence it without derailing your programme.
cardDescription: The 10% rule, the statutory metric, the 30-year requirement,
  the on-site/off-site hierarchy, and exactly what developers must evidence to
  get planning permission.
ctaHeading: Calculate your biodiversity units with VerdCore
ctaBody: VerdCore includes a Statutory Biodiversity Metric calculator alongside
  your carbon tracking — assess habitat units for area habitats, hedgerows and
  watercourses, model your 10% gain, and keep the evidence in one place.
footerNote: This guide is general information, not legal, planning or ecological
  advice. Refer to the statutory biodiversity metric and current GOV.UK /
  Natural England guidance for definitive requirements.
ogTitle: Biodiversity Net Gain (BNG) Explained for Developers
ogDescription: "Mandatory BNG in England: the 10% rule, the statutory metric,
  the 30-year rule, and what developers must submit."
faq:
  - q: What is Biodiversity Net Gain?
    a: Biodiversity Net Gain is a mandatory condition of planning permission in England requiring most new developments to deliver a minimum 10% measurable improvement in biodiversity, maintained for at least 30 years.
  - q: When did BNG become mandatory?
    a: 12 February 2024 for major developments and 2 April 2024 for small sites, under the Environment Act 2021, with Nationally Significant Infrastructure Projects following their own later timeline.
  - q: How is the 10% net gain calculated?
    a: Against your pre-development baseline biodiversity units using the statutory biodiversity metric, not against zero, so clearing a good-quality habitat first creates a deficit that then has to be made up, plus 10%.
  - q: What is the biodiversity gain hierarchy?
    a: On-site gains first, then off-site gains if 10% cannot be achieved within the development boundary, with statutory biodiversity credits bought from government as a deliberately unattractive last resort.
---
## What is Biodiversity Net Gain?

**Biodiversity Net Gain (BNG)** is an approach to development that leaves the natural environment in a **measurably better state** than before. It's no longer a voluntary best practice under the [**Environment Act 2021**](https://www.legislation.gov.uk/ukpga/2021/30/contents); BNG became a **mandatory condition of planning permission** in England, per [gov.uk's biodiversity net gain guidance](https://www.gov.uk/guidance/biodiversity-net-gain).

The headline requirement is simple to state: every applicable development must deliver a **minimum 10% net gain** in biodiversity, measured and maintained for at least **30 years**.

Like the increasing planning-authority requirement for a [Whole-Life Carbon Assessment](/resources/whole-life-carbon-assessments.html), BNG has moved from a nice-to-have to a hard condition of permission on larger schemes.

## When did it become mandatory?

BNG became a statutory requirement for most developments in England on a rolling basis:

* **12 February 2024** — major developments under the Town and Country Planning Act 1990.
* **2 April 2024** — small sites (minor developments).
* **Later phases** — Nationally Significant Infrastructure Projects (NSIPs) follow on their own timeline.

If your planning application falls in scope, you cannot discharge planning without demonstrating the 10% gain.

## How biodiversity is measured — the statutory metric

You can't manage what you can't measure, so BNG is quantified using the **statutory biodiversity metric** (Natural England's metric, currently version 4.0). It converts habitats into **biodiversity units** based on:

* **Size** — the area of the habitat (or length, for linear features).
* **Quality (condition)** — how good the habitat is, from poor to good.
* **Distinctiveness** — how ecologically valuable the habitat type is.
* **Strategic significance** — whether it's in a location identified as a priority for nature.

Crucially, three things are measured **separately,** and each must not fall below baseline:

| Measured separately | Examples |
| --- | --- |
| **Area habitats** | Grassland, woodland, scrub, and similar |
| **Hedgerows** | Field boundaries, tree lines |
| **Watercourses** | Rivers and streams |

Each category needs its own 10% gain — a surplus of area habitat units can't cover a hedgerow shortfall.

> **The maths that catches people out.** The 10% gain is calculated against your **pre-development baseline** biodiversity units not against zero. Clear a good-quality habitat and you create a large deficit you then have to make up, plus 10%. Surveying and protecting what's already there is almost always cheaper than recreating it.

## The biodiversity gain hierarchy

Like the carbon reduction hierarchy, BNG has an order of preference to deliver as high up the list as possible:

1. **On-site** — achieve the gain within the red-line boundary of your development (retained and enhanced habitats, new planting, green roofs, SuDS).
2. **Off-site** — if you can't hit 10% on-site, deliver or buy units on other land (your own or through the habitat market).
3. **Statutory biodiversity credits** are a **last resort**: credits bought from the government. These are deliberately priced to be the least attractive option.

<div class="diagram">
<div class="diagram-title">Biodiversity gain hierarchy</div>
<div class="steps-diagram">
<div class="step-item"><div class="step-num">1</div><div class="step-body"><div class="step-title">On-site</div><div class="step-desc">Retained and enhanced habitats, new planting, green roofs, SuDS — within the development's red-line boundary.</div></div></div>
<div class="step-item"><div class="step-num">2</div><div class="step-body"><div class="step-title">Off-site</div><div class="step-desc">Deliver or buy units on other land, your own or through the habitat market, for whatever 10% you can't hit on-site.</div></div></div>
<div class="step-item step-muted"><div class="step-num">3</div><div class="step-body"><div class="step-title">Statutory credits</div><div class="step-desc">Bought from government — deliberately priced as the least attractive option, a genuine last resort.</div></div></div>
</div>
<div class="diagram-caption">Deliver as high up the list as possible — on-site units are cheaper and more defensible than buying your way out later.</div>
</div>

## What developers must do — the practical steps

1. **Survey the baseline.** Commission a suitably qualified ecologist to assess existing habitats and calculate baseline units using the statutory metric. Do this **early; it** shapes your whole layout.
2. **Design to retain and avoid.** The cheapest units are the ones you never lose. Keep valuable habitats, hedgerows and trees where you can.
3. **Calculate the gain.** Model your post-development habitats and confirm you reach at least 110% of baseline units for each of the areas, hedgerows and watercourses.
4. **Prepare a Biodiversity Gain Plan.** Set out the baseline, the proposed habitats, how you meet the 10%, and how gains are secured and maintained for 30 years.
5. **Secure it legally.** On-site and off-site gains are secured through planning conditions, planning obligations (Section 106) or conservation covenants, with long-term management and monitoring.

## Common mistakes that cost time and money

* **Surveying too late.** Ecological surveys are seasonal. Missing a survey window can delay a scheme by months.
* **Clearing habitat before baselining.** Removing habitat before the baseline is agreed upon can mean it's still counted as if present (the "degradation" rule) or simply lands you with a bigger deficit.
* **Ignoring the 30-year commitment.** BNG isn't a one-off at planning; it's a three-decade management and monitoring obligation that must be resourced and funded — the same discipline a live [Environmental Management Plan](/resources/environmental-management-plans-explained.html) is built for, rather than a document filed once and forgotten.
* **Treating it as separate from carbon.** Low-carbon, nature-positive design decisions often overlap; the teams and data should talk to each other.

## How BNG and carbon fit together

BNG and carbon reporting are separate regimes, but they pull in the same direction and increasingly land on the same desk. A contractor or developer who can evidence **both** a credible carbon record ([PAS 2080](/resources/pas-2080-for-contractors.html), [PPN 06/21](/resources/ppn-06-21-explained.html)) **and** a compliant Biodiversity Gain Plan is telling clients and planners a coherent sustainability story and doing it from one set of project data rather than two disconnected spreadsheets — which is exactly what VerdCore's [BNG reporting software](/bng-reporting-software.html) is built for.