Dashboard
?
Emissions breakdown
📊
Your data will appear here once you log your first entry
Active sites
Weekly emissions trend Last 8 weeks · kg CO₂e
Log entries across multiple weeks to see your emissions trend
Recent activity
Profile completion 0%

Add your company name to get started

Company Information
Appears on every PDF report and tender certificate
8-digit Companies House number
Your Details
Sustainability Commitments
🔒 Your data is stored securely in Firebase and only visible to you.
Total consumed during this work period, not tank fill amount
Used in AI analysis and on PDF reports — be specific
Net quantity delivered to site — not ordered or wasted
Enables supplier carbon comparison when you have multiple entries
One-way distance per trip — AI uses this to identify batching opportunities
Specific descriptions help AI recommend delivery consolidation
Recent entries
🤖
No recommendations yet
Log at least a few days of site data to unlock personalised AI recommendations
What is benchmarking? UK benchmarks show how your site compares by project type. Performing better than average is powerful evidence for tender submissions and endorsing bodies.
Your Site vs UK Industry Average
Performance Rating
UK Construction Carbon Benchmarks (kgCO₂e/m²)
Sources: RICS WLCA, LETI Carbon Primer, UKGBC, RIBA 2030 Climate Challenge.
Assessments
Results
What is Biodiversity Net Gain (BNG)?

Biodiversity Net Gain (BNG) is a legal requirement under the Environment Act 2021. Most new developments in England must deliver at least a 10% net gain in biodiversity compared to the pre-development baseline.

Defra Biodiversity Metric 4.0 is the official government tool for measuring biodiversity in habitat units. It scores habitats based on type, area or length, condition, connectivity, and strategic significance.

How to use this calculator: Step 1 — enter all habitats present on site today (before development). Step 2 — enter all habitats proposed after development. Step 3 — review your net gain result and save.

Baseline — Area Habitats

Enter existing habitats on site before any development works.

50+ habitat types including grassland, woodland, wetland, heathland, and urban habitats per Defra Metric 4.0

Baseline — Linear Features

Hedgerows, watercourses, and other linear habitat features on site.

Includes hedgerows, watercourse margins, woodland edges, and other linear features

Add all habitats present on site today — before any works begin.

1
Scope 1 — Direct
Emissions your company directly controls: diesel generators, petrol plant, company vehicles, gas on-site.
2
Scope 2 — Purchased Energy
Electricity bought from the grid for site offices, welfare units, and temporary power.
3
Scope 3 — Value Chain
Embodied carbon in materials, supplier deliveries, subcontractor travel, and waste disposal.
Scope Breakdown
◍ Scope 3 Detail
Full Scope Table
Log Waste Entry
Waste Log
No waste entries yet
Attach this PDF to tender submissions when main contractors require carbon credentials. Aligned with PPN 06/21.
Certificate Details
Certificate Preview
Fill in the details above

Rating based on carbon intensity vs LETI/RICS UK benchmarks. A+ = Paris Aligned · A = Excellent · B = Good Practice · C = UK Typical · D = Below Typical. Enter floor area in Benchmarking to enable intensity-based ratings.

Generate Report
Carbon Summary
Site totals by fuel, material and transport with trend overview.
General
PAS 2080
Scope 1/2/3 breakdown aligned to the carbon management standard.
PAS 2080
PPN 06/21
Carbon Reduction Plan format for UK public sector tender bids.
Gov Tender
Full ESG
Complete ESG narrative: emissions, waste, BNG, and targets.
Full Report
Report Preview
Select a site to preview
Site Performance Ranking
Carbon by Project Type
All Projects Summary

VerdCore is building the compliance infrastructure layer for UK construction. Below is where the product is now and where it is going.

v1.0 — Live Now
Carbon tracking (30+ DEFRA emission factors), BNG Metric 4.0 calculator, Claude AI site-specific recommendations, PAS 2080 / PPN 06/21 / Full ESG PDF reports, Scope 1/2/3 breakdown, multi-project dashboard, waste tracker, tender certificate
v1.5 — Q3 2026 In Development
Team workspaces (multi-user sites, shared dashboards), role-based access (Site Manager / Project Manager / Director / View Only), collaborative report sign-off, invite-by-email onboarding
v2.0 — Q4 2026
REST API for integration with existing PM and finance systems, IoT sensor data ingestion (smart fuel meters, skip-fill sensors), BIM/IFC file import for automatic material take-offs, mobile-native app (iOS/Android)
Enterprise — 2027
Multi-tenant white-label platform for main contractors managing supply chain SMEs, Scope 3 supply chain carbon integration, CSRD (EU taxonomy) and ISSB S2 reporting modules, verified carbon offset marketplace integration
Team & Collaboration
Team Members
Account
Account type
Loading…

Password
Change your account password

Sign out everywhere
Sign out of all devices and browsers

Delete account
Permanently delete your account and all data. This cannot be undone.
Loading portfolio…